Harrison Western designed and built a new headframe around the existing 100-year-old headframe and mill building while the mine remained in operation. HW also designed the structural foundations, which were comprised of 18 drilled concrete piles, 65′ in depth. The piles were installed in close proximity to existing structures and utilities. HW completed this project in five months, from initial design through fabrication and final construction of the headframe.