State: Colorado

City: Loveland

Category:
Tunnel Rehabilitation

UIT installed 250 LF of 142”-diameter steel sliplining in an existing underground concrete water tunnel. 28 individual prefabricated steel casing rings were placed and welded on-site, then grouted and coated with epoxy.