State: Colorado

City: Creede

Category:
Tunnel Rehabilitation

Harrison Western rehabilitated this 100-year-old water tunnel, which sits at 10,000 feet elevation. The tunnel is 14′ wide, 12′ tall, and 400′ long. Work included pattern bolting, shotcrete, and pressure grouting. HW also drove a new 80’ long bypass tunnel, which was also bolted and reinforced with steel and shotcrete.

Estimating and

Business Development

(720) 552-0486

Estimating@harwest.com

Human Resources

and Safety

(720) 881-4056

HR@harwest.com

UIT

(303) 665-2704

info@theuitco.com