State: Colorado

City: Pinewood Springs

Category:
Tunneling

UIT installed 222 LF of 60”-diameter welded steel pipe using pipe ramming to replace CMP culverts. The pipe was hammered over the existing CMP, which was then removed leaving the steel pipe in place as the new culvert.

Estimating and

Business Development

(720) 552-0486

Estimating@harwest.com

Human Resources

and Safety

(720) 881-4056

HR@harwest.com

UIT

(303) 665-2704

info@theuitco.com