State: Colorado

City: Loveland

Category:
Tunnel Rehabilitation

UIT installed 250 LF of 142”-diameter steel sliplining in an existing underground concrete water tunnel. 28 individual prefabricated steel casing rings were placed and welded on-site, then grouted and coated with epoxy.

Estimating and

Business Development

(720) 552-0486

Estimating@harwest.com

Human Resources

and Safety

(720) 881-4056

HR@harwest.com

UIT

(303) 665-2704

info@theuitco.com